Search Results
12. Determination of barometric efficiency and effective porosity, boreholes UE-25 c#1, UE-25 c#2, and UE-25 c#3, Yucca Mountain, Nye County, Nevada
13. Determination of the 100-year flood plain on Fourmile Branch at the Savannah River Site, South Carolina, 1996
14. Determination of the 100-year flood plain on Pen Branch at Steel Creek, and their selected tributaries, Savannah River Site, South Carolina, 1996
15. Determination of the 100-year flood plain on Upper Three Runs and selected tributaries, and the Savannah River at the Savannah River Site, South Carolina, 1995
16. Determination of traveltimes in the lower San Joaquin River basin, California, from dye-tracer studies during 1994-1995
17. Determining discharge-coefficient ratings for coastal structures in Dade County, Florida
18. Development of a data base of community water-supply wells in New Jersey and a method of evaluate their sensitivity to contamination
19. Development, verification, and application of a simplified method to estimate total-streambed scour at bridge sites in Illinois
20. Development, verification, and application of a simplified method to estimate total-streambed scour at bridge sites in Illinois
- « Previous
- Next »
- 1
- 2
- 3